NHER 66333 (Monument record) - Undated ditches

The Norfolk Heritage Explorer is a filtered version of the Norfolk HER intended for casual research. Please to consult the full record.

See also further .

Summary

A geophysical survey of this site in 2021/2022 recorded nothing of obvious archaeological significant. The only responses of note were a number of irregular curvilinear anomalies, most of which were probably of natural origin. Subsequent trial trenching in 2022 also had largely negative results, with only two undated ditches recorded.

Protected Status/Designation

  • None recorded

Location

Map sheet TG11SW
Civil Parish EASTON, SOUTH NORFOLK, NORFOLK

Map

May 2018. Desk-based Assessment.
Environmental Impact Assessment of the potential impacts of the proposed Hornsea Project Three offshore wind farm on the historic environment. This study incorporated the results of an initial walkover survey and the first phases of geophysical survey.
See relevant chapter of Environmental Statement and associated appendices for further detail (S1).
P. Watkins (HES), 18 July 2023.

November 2021-March 2022. Geophysical Survey.
Magnetometer survey of site on proposed route of Hornsea Project Three offshore wind farm onshore cable (Area 53).
This survey identified nothing of definite archaeological significance. A number of irregular and curvilinear anomalies regarded as being of undetermined origin potentially represent archaeological remains although most are probably the result of natural variations in the soils or underlying geology.
Information from draft report. Final version awaited.
P. Watkins (HES), 18 July 2023.

February-June 2022. Trial Trenching.
Evaluation of site on proposed route of Hornsea Project Three offshore wind farm onshore cable (P3TT25; Trenches 977-984).
The eight trenches excavated at this location revealed only two ditches, one aligned north-to-south and the other east-to-west. Neither produced any dating evidence.
Information from draft report. Final version awaited.
P. Watkins (HES), 18 July 2023.

  • <S1> Unpublished Contractor Report: [anonymous]. 2018. Hornsea Project Three Offshore Wind Farm. Environmental Statement: Volume 3, Chapter 5 - Historic Environment. RPS Group.

Object Types (0)

Related NHER Records (0)

Record last edited

Sep 26 2025 11:23AM